Dismantling & Demolishing rates

33 dismantling & demolishing items from the Tripura PWD (R&B and Buildings), effective 2023-04-01.

Dismantling & Demolishing rates in the Tripura Building Schedule of Rates 2023 run from ₹1.50 to ₹2,087.30. Transcribed from Tripura PWD — SoR 2023: Building Works, basic rates as on or just before 01.04.2023. Reference only — verify against the official source before pricing a bid.

33 items — scroll the table to browse

DescriptionUnit
14.1Demolishing lime concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-chargeCum466.20
14.2.1Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-chargeNominal concrete 1:3:6 or richer mix (i/c equivalent design mix)Cum1,436.00
14.2.2Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-chargeNominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)Cum911.70
14.3Demolishing reinforced cement concrete manually / by mechanical means including stacking of steel bars properly and disposal of unserviceable material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-chargeCum2,087.30
14.4Demolishing reinforced brick work manually / by mechanical means including stacking of steel bars, bricks/ brick slump properly and disposal of unserviceable material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-chargeCum1,805.40
14.5Extra for cutting reinforcement in RCC or R.B. work manually / by mechanical means (payment to made on the cross sectional area of RCC or R.B. work) etc. complete as per direction of the Engineer- in-chargeSqm767.30
14.6Extra for scrapping, cleaning and straightening reinforcement obtained from RCC or R.B. work etc. complete as per direction of the Engineer- in-chargeKG4.50
14.7.1Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials with all lifts and upto a lead of 50m etc. complete as per direction of the Engineer- in-chargeIn mud mortarCum405.20
14.7.2Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials with all lifts and upto a lead of 50m etc. complete as per direction of the Engineer- in-chargeIn lime mortarCum476.70
14.7.3Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials with all lifts and upto a lead of 50m etc. complete as per direction of the Engineer- in-chargeIn cement mortarCum1,145.40
14.8.1Removing mortar from brick and cleaning bricks including stacking bricks and disposal rubbish with all lifts and upto a lead of 50 m etc. complete as per direction of the Engineer- in-chargeIn mud mortarEach2.60
14.8.2Removing mortar from brick and cleaning bricks including stacking bricks and disposal rubbish with all lifts and upto a lead of 50 m etc. complete as per direction of the Engineer- in-chargeIn lime mortarEach3.10
14.8.3Removing mortar from brick and cleaning bricks including stacking bricks and disposal rubbish with all lifts and upto a lead of 50 m etc. complete as per direction of the Engineer- in-chargeIn cement mortarEach3.80
14.10Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead: Of area 3 sqm and below. Of area beyond 3 sqmEach75.70
14.11Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead: Of sectional area 40 sq cm and below. Of sectional area beyond 40 sq cmMetre10.30
14.14Dismantling steel work in single section including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50 m etc.complete as per direction of the Engineer- in-charge:- R.S Joists. Channels, angles, tees and flatsKG1.50
14.15Dismantling steel work in built up section in channels, angles, tees, flats including all gusset plates, bolts, nuts, cutting rivets, welding including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50 m etc. complete as per direction of the Engineer- in-chargeKG3.10
14.16Dismantling steel work in built up section manually / mechanically without dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50 m etc. complete as per direction of the Engineer- in-chargeKG2.20
14.19Dismantling dry brick pitching in floors, drains etc. including stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50 m etc.complete as per direction of the Engineer- in-chargeCum744.80
14.20Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm For thickness of tiles above 25 mm and up to 40 mmSqm41.50
14.21Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm144.40
14.22Dismantling GS sheet roofing including ridges, hips, valleys, gutters wind ties etc. including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50 m etc.complete as per direction of the Engineer- in-chargeSqm92.80
14.23Dismantling old plaster or pointing, raking out joints, cleaning and preparing the surface for re-plastering or re-pointing including disposal of rubbish to the dumping ground with all leads and lifts etc.complete as per direction of the Engineer- in-chargeSqm30.10
14.24Dismantling old glass panes from wooden / steel structures including stacking of serviceable materials and disposal of rubbish and unserviceable materials to the dumping ground with all leads and lifts etc.complete as per direction of the Engineer- in- chargeSqm14.00
14.25Dismantling ballies or wooden posts and struts including stacking within 50 metres leadMetre11.40
14.26Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of: T' or 'L' iron or pipe RCCEach139.10
14.27Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead: Thickness up to 40 mm Thickness above 40 mm up to 75 mmSqm157.20
14.28Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge: 15 mm to 40 mm nominal bore Above 40 mm nominal boreMetre75.60
14.29Dismantling C.I. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in- charge: Up to 150 mm diameter Above 150 mm dia up to 300 mm dia Above 300 mm diameterMetre244.00
14.30Taking out C.I. cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-chargeEach372.40
14.31Taking out C.I. cover with frame from R.C.C. top slab of inspection chambers of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-inchargeEach223.40
14.32Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres leadEach474.00
14.33Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable surplus material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge. Hire and running charges of tipper Hire and running charges of loader. Hire and running charges of hydraulic piling rig with power unit etc. including complete accessories and shifting at site. Hire and running charges of light crane. Hire and running charges of bentonite pump. Hire and running charges of vibrating pile driving hammer complete with power unit and accessories. Hire and running charges of crane 20 tonne capacity. Hire and running charges of Tripod and Mechanical Winch machine complete with power unit and accessories. Hire and running charges of drill machine upto 400 mm dia. (including cost of mobil oil, diesel consumption in ordinary soil and operator) Pile integrity testing equipment Beldar Mistry Technician Helper (Technician) C.I. pile shoe. M.S. clamps for pile shoe of 35 kg per pile. Bentonite. Vertical load testing (initial) of piles in accordance with IS: 2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification and up to 50 tonne capacity pile Vertical load testing (initial) of piles in accordance with IS: 2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & above 50 tonne and up to 100 tonne Vertical load testing (initial) of piles in accordance with IS: 2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & group of two or more up to 50 tonne Cyclic vertical load testing of piles in accordance with IS: 2911 (Part-IV) including preparation of pile head etc. for Single pile up to 50 tonne capacity Cyclic vertical load testing of piles in accordance with IS: 2911 (Part-IV) including preparation of pile head etc. for Single pile above 50 tonne capacity pile and up to 100 tonne capacity pile Cyclic vertical load testing of piles in accordance with IS: 2911 (Part-IV) including preparation of pile head etc. for Group of two piles up to 50 tonne capacity each Lateral load testing of single pile in accordance with IS: 2911 part -IV for determining safe allowable lateral load on pile up to 50 tonne capacity Lateral load testing of single pile in accordance with IS: 2911 part -IV for determining safe allowable lateral load on pile above 50 tonne capacity Carriage: Steel Carriage: Cast iron fittings Carriage: BentoniteSqm31.10

Pricing dismantling & demolishing against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.