Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars

Item number
15.58
Analysis basis
Details of cost for 1 cum
Priced inputs
8
Derived rate
2,818.90 / cum

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.58 Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars — is derived from 8 priced inputs for 1 cum and works out to ₹2,818.90 per cum after water charges, GST, CPOH and cess. The full build-up is below.

  • Labour for operating pneumatic tools
  • Labour for cutting reinforcement bars.
CodeInputUnitQuantityRate (INR)Amount (INR)
0128MateLabourday0.03816.0024.48
0139Skilled Beldar (for floor rubbing etc.)Labourday0.5816.00408.00
0114BeldarLabourday0.5736.00368.00
0103Blacksmith 2nd classLabourday0.5816.00408.00
0114BeldarLabourday0.5736.00368.00
0040Air compressor 250 cfm with two leads for pneumatic cutters/ hammersAir compressor 250 cfm with two leads for pneumatic cutters / hammersMachineryday0.1251,800.00225.00
0039Tractor with trolley .Tractor with trolleyMachineryday0.051,350.0067.50
0041Joint cutting machine with 2-3 bladesMachineryday0.125900.00112.50
TOTAL
1,981.48
Add 1 % Water charges on “W”
19.81
TOTAL
2,001.29
Add GST on “X” (multiplying factor 0.2127)
425.67
TOTAL
2,426.96
Add 15% CPOH on “Y”
364.04
TOTAL
2,791.00
Add Cess @ 1% on “Z”
27.91
Cost of 1 cum
2,818.91
Say
2,818.90

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1140. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.