R-DAR/CPWD ANALYSIS OF RATESEFFECTIVE 2023-09-14

3,149 rate analyses, searchable

The CPWD Delhi Analysis of Rates 2023 (Civil), with each item's rate worked out from its priced material, labour and machinery inputs, across 26 trades. Searchable, with the full cost build-up for each item, dated and linked to the CPWD source.
Rate analyses
3,149
Trade sub-heads
26
Priced inputs
18,905
Basic rates
2,405
D-01/SEARCH & BROWSE26 SUB-HEADS
D-02/SOURCEDAR 2023
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
D-03/ABOUT THE DATA

What the Analysis of Rates gives you

A Schedule of Rates gives one number per item: the accepted rate. The Analysis of Rates shows how that number is built: the quantity of cement, sand, steel, labour and plant that goes into a unit of the work, each priced from the department's Basic Rates, summed, then taken through water charges, GST, contractor's profit and overheads (CPOH) and cess to the rate an estimate actually carries. Each item on these pages shows that full build-up, so you can check how a rate was reached and adjust it when a project's inputs differ.

The CPWD DAR is the reference most central-government building work in India is priced against, and it feeds the Delhi Schedule of Rates. For the item-level rates published by each state, see the state Schedule of Rates tables.

Terms of use

These analyses are transcribed from the CPWD Delhi Analysis of Rates 2023 (Civil), published by the Central Public Works Department (CPWD). The rates and their derivation are the department's work, not ours; this page names the edition, its effective date, and links to the CPWD source.

They are published free for reference. This is not an official publication, carries no warranty, and is not a substitute for the department's own document. CPWD amends rates through correction slips between editions, so figures here can be superseded. Verify against the official source before pricing a bid or submitting an estimate. Every line was cross-checked against the printed subtotal and the Basic Rates catalog; items that could not be reconciled were left out, so a sub-head here may hold fewer items than its source.

ARCHED / ESTIMATING

Pricing a live tender against the DAR

Building an estimate from the Analysis of Rates by hand (mapping a BOQ to the right items, carrying each analysis's build-up and applying the current cost index) takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.