3,149 rate analyses, searchable
- Rate analyses
- 3,149
- Trade sub-heads
- 26
- Priced inputs
- 18,905
- Basic rates
- 2,405
- 015 ITEMSCarriage of Materials
- 0280 ITEMSEarth Work
- 0319 ITEMSMortars
- 0474 ITEMSConcrete Work
- 05141 ITEMSReinforced Cement Concrete
- 0658 ITEMSMasonry Work
- 0753 ITEMSStone Work
- 0873 ITEMSCladding Work
- 09400 ITEMSWood and PVC Work
- 1053 ITEMSSteel Work
- 11133 ITEMSFlooring
- 12141 ITEMSRoofing
- 13155 ITEMSFinishing
- 1497 ITEMSRepairs to Buildings
- 1592 ITEMSDismantling and Demolishing
- 16149 ITEMSRoad Work
- 17228 ITEMSSanitary Installations
- 18698 ITEMSWater Supply
- 19123 ITEMSDrainage
- 2043 ITEMSPile Work
- 2142 ITEMSAluminium Work
- 2229 ITEMSWater Proofing
- 2339 ITEMSRain Water Harvesting & Tube Wells
- 248 ITEMSConservation of Heritage Buildings
- 257 ITEMSStructural Glazing Aluminium Composite Panel
- 26209 ITEMSNew Technologies and Materials
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
What the Analysis of Rates gives you
A Schedule of Rates gives one number per item: the accepted rate. The Analysis of Rates shows how that number is built: the quantity of cement, sand, steel, labour and plant that goes into a unit of the work, each priced from the department's Basic Rates, summed, then taken through water charges, GST, contractor's profit and overheads (CPOH) and cess to the rate an estimate actually carries. Each item on these pages shows that full build-up, so you can check how a rate was reached and adjust it when a project's inputs differ.
The CPWD DAR is the reference most central-government building work in India is priced against, and it feeds the Delhi Schedule of Rates. For the item-level rates published by each state, see the state Schedule of Rates tables.
Terms of use
These analyses are transcribed from the CPWD Delhi Analysis of Rates 2023 (Civil), published by the Central Public Works Department (CPWD). The rates and their derivation are the department's work, not ours; this page names the edition, its effective date, and links to the CPWD source.
They are published free for reference. This is not an official publication, carries no warranty, and is not a substitute for the department's own document. CPWD amends rates through correction slips between editions, so figures here can be superseded. Verify against the official source before pricing a bid or submitting an estimate. Every line was cross-checked against the printed subtotal and the Basic Rates catalog; items that could not be reconciled were left out, so a sub-head here may hold fewer items than its source.
Pricing a live tender against the DAR
Building an estimate from the Analysis of Rates by hand (mapping a BOQ to the right items, carrying each analysis's build-up and applying the current cost index) takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.