Skip to main content

CPWD Analysis of Rates · Dismantling and Demolishing

Dismantling of spindle fire hydrant including stacking of useful materials within 50 metres lead

Item number
15.54
Analysis basis
Detail of cost for 10 Nos
Priced inputs
3
Derived rate
726.35 / Nos

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.54 Dismantling of spindle fire hydrant including stacking of useful materials within 50 metres lead — is derived from 3 priced inputs for 10 Nos and works out to ₹726.35 each after water charges, GST, CPOH and cess. The full build-up is below.

CodeInputUnitQuantityRate (INR)Amount (INR)
0116Fitter (grade 1)Labourday1.5897.001,345.50
0117Assistant Fitter or 2nd class FitterLabourday1816.00816.00
0114BeldarLabourday4736.002,944.00
TOTAL
5,105.50
Add 1 % Water charges on “W”
51.06
TOTAL
5,156.56
Add GST on “X” (multiplying factor 0.2127)
1,096.80
TOTAL
6,253.36
Add 15% CPOH on “Y”
938.00
TOTAL
7,191.36
Add Cess @ 1% on “Z”
71.91
Cost of 10 Nos
7,263.27
Cost of each
726.33
Say
726.35

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1137. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works