Dismantling of C.I. sluice valve including stacking of useful materials within a lead of 50 metres
- Item number
- 15.53.1
- Analysis basis
- dismantling 10
- Priced inputs
- 4
- Derived rate
- ₹319.50/ DISMANTLING 10
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.53.1 (Dismantling of C.I. sluice valve including stacking of useful materials within a lead of 50 metres Up to 150 mm diameter) is derived from 4 priced inputs for dismantling 10 and works out to ₹319.50 per dismantling 10 after water charges, GST, CPOH and cess. The full build-up is below.
- (ave.) 100mm
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0116 | LAB | Fitter (grade 1) | day | 0.6 | 897.00 | 538.20 |
| 0117 | LAB | Assistant Fitter or 2nd class Fitter | day | 0.4 | 816.00 | 326.40 |
| 0114 | LAB | Beldar | day | 1.6 | 736.00 | 1,177.60 |
| 9999 | MAT | Sundries for removing the R.C.C. cover etc for dismantling sluice valve | L.S. | 89.7 | 2.27 | 203.62 |
- TOTAL
- 2,245.82
- Add 1 % Water charges on “W”
- +22.46
- TOTAL
- 2,268.28
- Add GST on “X” (multiplying factor 0.2127)
- +482.46
- TOTAL
- 2,750.74
- Add 15% CPOH on “Y”
- +412.61
- TOTAL
- 3,163.35
- Add Cess @ 1% on “Z”
- +31.63
- Cost of 10 Nos
- 3,194.98
- Cost of each
- 319.50
- SAY
- ₹319.50
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1136
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1136. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.