Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead

Item number
15.52
Analysis basis
Detail of cost for each
Priced inputs
3
Derived rate
₹112.05
D-01/RATE ANALYSISITEM 15.52

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.52 (Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead) is derived from 3 priced inputs and works out to ₹112.05 after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 15.52DETAIL OF COST FOR EACH
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0117LABFitter (grade 2)Assistant Fitter or 2nd class Fitterday0.05816.0040.80
0114LABBeldarday0.05736.0036.80
9999MATSundriesL.S.0.522.271.18
BUILD-UP TO RATE
TOTAL
78.78
Add 1 % Water charges on “W”
+0.79
TOTAL
79.57
Add GST on “X” (multiplying factor 0.2127)
+16.92
TOTAL
96.49
Add 15% CPOH on “Y”
+14.47
TOTAL
110.96
Add Cess @ 1% on “Z”
+1.11
Cost of each
112.07
SAY
₹112.05
D-02/SOURCEPRINTED PAGE 1135
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1135

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1135. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSDISMANTLING AND DEMOLISHING
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.