Dismantling of road gully chamber of various sizes including C.I. grating with frame including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead including refilling the excavated gap

Item number
15.51
Analysis basis
Detail of cost for one chamber
Priced inputs
10
Derived rate
958.75 / one chamber

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.51 Dismantling of road gully chamber of various sizes including C.I. grating with frame including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead including refilling the excavated gap — is derived from 10 priced inputs for one chamber and works out to ₹958.75 per one chamber after water charges, GST, CPOH and cess. The full build-up is below.

  • Dismantling cement concrete
  • a) 1:5:10 1.05x1.00x0.15m =0.16cum
  • Dismantling brick work in cement mortar
  • 2.70x0.20x0.45m =0.24cum
  • Dismantling cement concrete
  • b) 1:2:4 2.70x0.20x0.15m =0.08cum
CodeInputUnitQuantityRate (INR)Amount (INR)
0114BeldarLabourday0.14736.00103.04
0115CoolieLabourday0.09736.0066.24
9999SundriesMaterialL.S.0.262.270.59
0114BeldarLabourday0.25736.00184.00
0115CoolieLabourday0.22736.00161.92
9999SundriesMaterialL.S.0.522.271.18
0114BeldarLabourday0.13736.0095.68
0115CoolieLabourday0.06736.0044.16
9999Sundries for scaffolding etcMaterialL.S.0.392.270.89
9999Dismantling C.I. GratingMaterialL.S.7.152.2716.23
TOTAL
673.93
Add 1 % Water charges on “W”
6.74
TOTAL
680.67
Add GST on “X” (multiplying factor 0.2127)
144.78
TOTAL
825.45
Add 15% CPOH on “Y”
123.82
TOTAL
949.27
Add Cess @ 1% on “Z”
9.49
Cost of each
958.76
Say
958.75

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1135. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.