Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually/ by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-charge

Above 150 mm diameter
Item number
15.47.2
Analysis basis
10 metre
Priced inputs
6
Derived rate
₹403.05/ METRE
D-01/RATE ANALYSISITEM 15.47.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.47.2 (Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually/ by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-charge : Above 150 mm diameter) is derived from 6 priced inputs for 10 metre and works out to ₹403.05 per metre after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Earth work in excavation for dismantling pipes
  • including refilling of excavated earth
  • 10.00x0.65x0.75 m =4.88cum
  • =1x10x(22/7)/4x(0.274)x(0.274) =0.590cum
  • Total=4.29cum
  • Deduct for pipes of average 250 mm dia
ANALYSIS OF RATES · ITEM 15.47.2DETAIL OF COST FOR 10 METRE OR 11 NOS JOINTS
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0114LABBeldarday1.24736.00912.64
0115LABCoolieday1.28736.00942.08
0101LABBhistiday0.07816.0057.12
0114LABBeldarday0.36736.00264.96
0115LABCoolieday0.88736.00647.68
9988MATCarriage and sundriesL.S.3.772.278.56
BUILD-UP TO RATE
TOTAL
2,833.04
Add 1 % Water charges on “W”
+28.33
TOTAL
2,861.37
Add GST on “X” (multiplying factor 0.2127)
+608.61
TOTAL
3,469.98
Add 15% CPOH on “Y”
+520.50
TOTAL
3,990.48
Add Cess @ 1% on “Z”
+39.90
Cost of 10.00 metre
4,030.38
Cost of 1.00 metre
403.04
SAY
₹403.05
D-02/SOURCEPRINTED PAGE 1132
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1132

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1132. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSDISMANTLING AND DEMOLISHING
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.