Skip to main content

Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge

Above 40 mm nominal bore
Item number
15.44.2
Analysis basis
10 metre
Priced inputs
3
Derived rate
₹161.40/ METRE
D-01/RATE ANALYSISITEM 15.44.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.44.2 (Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge : Above 40 mm nominal bore) is derived from 3 priced inputs for 10 metre and works out to ₹161.40 per metre after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Trenching and refilling etc
ANALYSIS OF RATES · ITEM 15.44.2DETAIL OF COST FOR 10 METRE
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0114LABBeldarday0.66736.00485.76
0115LABCoolieday0.66736.00485.76
9999MATDismantling G.I. pipe and stacking etcL.S.71.762.27162.90
BUILD-UP TO RATE
TOTAL
1,134.42
Add 1 % Water charges on “W”
+11.34
TOTAL
1,145.76
Add GST on “X” (multiplying factor 0.2127)
+243.70
TOTAL
1,389.46
Add 15% CPOH on “Y”
+208.42
TOTAL
1,597.88
Add Cess @ 1% on “Z”
+15.98
Cost of 10.00 metre
1,613.86
Cost of 1.00 metre
161.39
SAY
₹161.40
D-02/SOURCEPRINTED PAGE 1128
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1128

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1128. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSDISMANTLING AND DEMOLISHING
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.