Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - incharge

Item number
15.3
Analysis basis
1 cum
Priced inputs
3
Derived rate
₹3,551.25/ CUM
D-01/RATE ANALYSISITEM 15.3

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.3 (Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - incharge) is derived from 3 priced inputs for 1 cum and works out to ₹3,551.25 per cum after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 15.3DETAIL OF COST FOR 1 CUM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0114LABBeldarday2.65736.001,950.40
0115LABCoolieday0.72736.00529.92
9999MATSundriesL.S.7.022.2715.94
BUILD-UP TO RATE
TOTAL
2,496.26
Add 1 % Water charges on “W”
+24.96
TOTAL
2,521.22
Add GST on “X” (multiplying factor 0.2127)
+536.26
TOTAL
3,057.48
Add 15% CPOH on “Y”
+458.62
TOTAL
3,516.10
Add Cess @ 1% on “Z”
+35.16
Cost of 1.00 cum
3,551.26
SAY
₹3,551.25
D-02/SOURCEPRINTED PAGE 1100
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1100

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1100. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.