Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional height of one metre or part thereof beyond 5 metres

Item number
15.21
Analysis basis
1 quintal
Priced inputs
3
Derived rate
₹0.85/ QUINTAL PER METRE HEIGHT
D-01/RATE ANALYSISITEM 15.21

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.21 (Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional height of one metre or part thereof beyond 5 metres) is derived from 3 priced inputs for 1 quintal and works out to ₹0.85 per quintal per metre height after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • height of 1 metre beyond 5 metre
ANALYSIS OF RATES · ITEM 15.21DETAIL OF COST FOR 1 QUINTAL FOR EVERY ADDITIONAL
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0100LABBandhaniday0.02816.0016.32
0114LABBeldarday0.06736.0044.16
9999MATSundriesL.S.0.392.270.89
BUILD-UP TO RATE
TOTAL
61.37
Add 1 % Water charges on “W”
+0.61
TOTAL
61.98
Add GST on “X” (multiplying factor 0.2127)
+13.18
TOTAL
75.16
Add 15% CPOH on “Y”
+11.27
TOTAL
86.43
Add Cess @ 1% on “Z”
+0.86
Cost of 1.00 quintal per metre height
87.29
Cost of 1.00 kg per metre height
0.87
SAY
₹0.85
D-02/SOURCEPRINTED PAGE 1113
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1113

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1113. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.