Skip to main content

Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge

Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Item number
15.2.1
Analysis basis
1 cum
Priced inputs
3
Derived rate
₹2,434.25/ CUM
D-01/RATE ANALYSISITEM 15.2.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.2.1 (Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)) is derived from 3 priced inputs for 1 cum and works out to ₹2,434.25 per cum after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 15.2.1DETAIL OF COST FOR 1 CUM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0114LABBeldarday1.59736.001,170.24
0115LABCoolieday0.72736.00529.92
9999MATSundriesL.S.4.812.2710.92
BUILD-UP TO RATE
TOTAL
1,711.08
Add 1 % Water charges on “W”
+17.11
TOTAL
1,728.19
Add GST on “X” (multiplying factor 0.2127)
+367.59
TOTAL
2,095.78
Add 15% CPOH on “Y”
+314.37
TOTAL
2,410.15
Add Cess @ 1% on “Z”
+24.10
Cost of 1.00 cum
2,434.25
SAY
₹2,434.25
D-02/SOURCEPRINTED PAGE 1099
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1099

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1099. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSDISMANTLING AND DEMOLISHING
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.