Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in
- Item number
- 15.17.1
- Analysis basis
- 1 quintal
- Priced inputs
- 4
- Derived rate
- ₹3.40/ QUINTAL
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.17.1 (Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: R.S. Joists) is derived from 4 priced inputs for 1 quintal and works out to ₹3.40 per quintal after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0103 | LAB | Blacksmith 2nd class | day | 0.05 | 816.00 | 40.80 |
| 0100 | LAB | Bandhani | day | 0.1 | 816.00 | 81.60 |
| 0114 | LAB | Beldar | day | 0.15 | 736.00 | 110.40 |
| 9999 | MAT | Sundries | L.S. | 2.73 | 2.27 | 6.20 |
- TOTAL
- 239.00
- Add 1 % Water charges on “W”
- +2.39
- TOTAL
- 241.39
- Add GST on “X” (multiplying factor 0.2127)
- +51.34
- TOTAL
- 292.73
- Add 15% CPOH on “Y”
- +43.91
- TOTAL
- 336.64
- Add Cess @ 1% on “Z”
- +3.37
- Cost of 1.00 quintal
- 340.01
- Cost of 1.00 kg
- 3.40
- SAY
- ₹3.40
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1111
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1111. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.