Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional height of one metre or part thereof beyond 5 metres
- Item number
- 15.16.2
- Analysis basis
- 10 metre
- Priced inputs
- 3
- Derived rate
- ₹3.40/ METRE PER METRE HEIGHT
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.16.2 (Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional height of one metre or part thereof beyond 5 metres : Of sectional area below 40 square centimetres) is derived from 3 priced inputs for 10 metre and works out to ₹3.40 per metre per metre height after water charges, GST, CPOH and cess. The full build-up is below.
- height of 1 metre
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0103 | LAB | Blacksmith 2nd class | day | 0.01 | 816.00 | 8.16 |
| 0114 | LAB | Beldar | day | 0.02 | 736.00 | 14.72 |
| 9999 | MAT | Sundries | L.S. | 0.39 | 2.27 | 0.89 |
- TOTAL
- 23.77
- Add 1 % Water charges on “W”
- +0.24
- TOTAL
- 24.01
- Add GST on “X” (multiplying factor 0.2127)
- +5.11
- TOTAL
- 29.12
- Add 15% CPOH on “Y”
- +4.37
- TOTAL
- 33.49
- Add Cess @ 1% on “Z”
- +0.33
- Cost of 10.00 metre per metre height
- 33.82
- Cost of 1.00 metre per metre height
- 3.38
- SAY
- ₹3.40
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1111
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1111. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.