Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional height of one metre or part thereof beyond 5 metres

Of sectional area 40 square centimetres and above
Item number
15.16.1
Analysis basis
1 cum
Priced inputs
3
Derived rate
₹857.00/ CUM PER METRE HEIGHT
D-01/RATE ANALYSISITEM 15.16.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.16.1 (Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional height of one metre or part thereof beyond 5 metres : Of sectional area 40 square centimetres and above) is derived from 3 priced inputs for 1 cum and works out to ₹857.00 per cum per metre height after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • height of 1 metre
ANALYSIS OF RATES · ITEM 15.16.1DETAIL OF COST FOR 1 CUM FOR EVERY ADDITIONAL
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0103LABBlacksmith 2nd classday0.25816.00204.00
0114LABBeldarday0.5736.00368.00
9999MATSundriesL.S.13.392.2730.40
BUILD-UP TO RATE
TOTAL
602.40
Add 1 % Water charges on “W”
+6.02
TOTAL
608.42
Add GST on “X” (multiplying factor 0.2127)
+129.41
TOTAL
737.83
Add 15% CPOH on “Y”
+110.67
TOTAL
848.50
Add Cess @ 1% on “Z”
+8.49
Cost of 1.00 cum per metre height
856.99
SAY
₹857.00
D-02/SOURCEPRINTED PAGE 1110
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1110

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1110. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.