Skip to main content

Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead

Of sectional area below 40 square centimetres
Item number
15.14.2
Analysis basis
10 metre
Priced inputs
3
Derived rate
₹17.85/ METRE
D-01/RATE ANALYSISITEM 15.14.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.14.2 (Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead : Of sectional area below 40 square centimetres) is derived from 3 priced inputs for 10 metre and works out to ₹17.85 per metre after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 15.14.2DETAIL OF COST FOR 10 METRE
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0112LABCarpenter 2nd classday0.08816.0065.28
0114LABBeldarday0.08736.0058.88
9999MATSundriesL.S.0.522.271.18
BUILD-UP TO RATE
TOTAL
125.34
Add 1 % Water charges on “W”
+1.25
TOTAL
126.59
Add GST on “X” (multiplying factor 0.2127)
+26.93
TOTAL
153.52
Add 15% CPOH on “Y”
+23.03
TOTAL
176.55
Add Cess @ 1% on “Z”
+1.77
Cost of 10.00 metre
178.32
Cost of 1.00 metre
17.83
SAY
₹17.85
D-02/SOURCEPRINTED PAGE 1109
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1109

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1109. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSDISMANTLING AND DEMOLISHING
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.