Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead

Of sectional area 40 square centimetres and above
Item number
15.14.1
Analysis basis
1 cum
Priced inputs
3
Derived rate
₹4,459.10/ CUM
D-01/RATE ANALYSISITEM 15.14.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.14.1 (Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead : Of sectional area 40 square centimetres and above) is derived from 3 priced inputs for 1 cum and works out to ₹4,459.10 per cum after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 15.14.1DETAIL OF COST FOR 1 CUM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0112LABCarpenter 2nd classday2816.001,632.00
0114LABBeldarday2736.001,472.00
9999MATSundriesL.S.13.392.2730.40
BUILD-UP TO RATE
TOTAL
3,134.40
Add 1 % Water charges on “W”
+31.34
TOTAL
3,165.74
Add GST on “X” (multiplying factor 0.2127)
+673.35
TOTAL
3,839.09
Add 15% CPOH on “Y”
+575.86
TOTAL
4,414.95
Add Cess @ 1% on “Z”
+44.15
Cost of 1.00 cum
4,459.10
SAY
₹4,459.10
D-02/SOURCEPRINTED PAGE 1109
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1109

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1109. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.