Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead
- Item number
- 15.13.2
- Analysis basis
- Detail of cost for each
- Priced inputs
- 3
- Derived rate
- ₹188.90
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.13.2 (Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead : Of area beyond 3 sq. metres) is derived from 3 priced inputs and works out to ₹188.90 after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0112 | LAB | Carpenter 2nd class | day | 0.07 | 816.00 | 57.12 |
| 0114 | LAB | Beldar | day | 0.1 | 736.00 | 73.60 |
| 9999 | MAT | Sundries | L.S. | 0.91 | 2.27 | 2.07 |
- TOTAL
- 132.79
- Add 1 % Water charges on “W”
- +1.33
- TOTAL
- 134.12
- Add GST on “X” (multiplying factor 0.2127)
- +28.53
- TOTAL
- 162.65
- Add 15% CPOH on “Y”
- +24.40
- TOTAL
- 187.05
- Add Cess @ 1% on “Z”
- +1.87
- Cost of each
- 188.92
- SAY
- ₹188.90
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1108
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1108. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.