Assam SOR 2020-21
Site Clearance and Setting Out rates
44 site clearance and setting out items from the Assam PWD (Roads), effective 2020-12-31.
Site Clearance and Setting Out rates in the Assam Schedule of Rates for Rural Roads 2020-21 run from ₹11.80 to ₹67,527.10. Transcribed from Government of Assam, Public Works Roads Department — Schedule of Rates for Rural Roads, 2020-21. Built on the MoRD/IRC Standard Data Book for Analysis of Rates for Rural Roads; Part D additionally covers major roads and bridge works to MoRT&H specification.. Reference only — verify against the official source before pricing a bid.
44 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 2.1 (i) | Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201By Manual Means | Hectare | 12,955.00 |
| 2.2 (i) (a) | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 — By Manual MeansIn area of non thorny jungle | Hectare | 46,898.30 |
| 2.2 (i) (b) | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 — By Manual MeansIn area of thorny jungle | Hectare | 67,527.10 |
| 2.2 (ii) (a) | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 — By Mechanical MeansIn area of non-thorny jungle | Hectare | 25,414.40 |
| 2.2 (ii) (b) | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 — By Mechanical MeansIn area of thorny jungle | Hectare | 31,023.90 |
| 2.4 A i | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 100 mGirth above 300 mm to 600 mm | Each | 137.80 |
| 2.4 A ii | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 100 mGirth above 600 mm to 900 mm | Each | 217.30 |
| 2.4 A iii | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 100 mGirth above 900 mm to 1800 mm | Each | 462.90 |
| 2.4 A iv | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 100 mGirth above 1800 mm to 2700 mm | Each | 913.70 |
| 2.4 A v | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 100 mGirth above 2700 mm to 4500 mm | Each | 1,839.90 |
| 2.4 A vi | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 100 mGirth above 4500 mm | Each | 5,203.20 |
| 2.4 B i | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 1000 mGirth above 300 mm to 600 mm | Each | 141.10 |
| 2.4 B ii | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 1000 mGirth above 600 mm to 900 mm | Each | 228.80 |
| 2.4 B iii | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 1000 mGirth above 900 mm to 1800 mm | Each | 476.70 |
| 2.4 B iv | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 1000 mGirth above 1800 mm to 2700 mm | Each | 932.10 |
| 2.4 B v | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 1000 mGirth above 2700 mm to 4500 mm | Each | 1,862.90 |
| 2.4 B vi | Uprooting and Removing Stumps & Roots Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201 — Lead upto 1000 mGirth above 4500 mm | Each | 5,318.20 |
| 2.6 (b) | Dismantling Brick/Tile Work Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202Cement mortar | Cum | 241.10 |
| 2.6 (d) | Dismantling Brick/Tile Work Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202Dry Brick Pitching or Brick Soling | Cum | 149.70 |
| 2.7 (a) | Dismantling Stone Masonry as per Technical Specification Clause 202 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202Rubble Stone Masonry in Lime Mortar | Cum | 236.40 |
| 2.7 (b) | Dismantling Stone Masonry as per Technical Specification Clause 202 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202Rubble Stone Masonry in Cement Mortar | Cum | 183.50 |
| 2.7 (c) | Dismantling Stone Masonry as per Technical Specification Clause 202 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202Rubble Stone Masonry in Mud Mortar | Cum | 180.00 |
| 2.7 (d) | Dismantling Stone Masonry as per Technical Specification Clause 202 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202Dry Rubble Masonry | Cum | 167.00 |
| 2.7 (e) | Dismantling Stone Masonry as per Technical Specification Clause 202 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202Dismantling Stone Pitching / Dry Stone Spalls | Cum | 167.50 |
| 2.7 (f) | Dismantling Stone Masonry as per Technical Specification Clause 202 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202Dismantling boulders laid in wire crates including opening of crates and stacking dismantled materials | Cum | 210.50 |
| 2.8 | Dismantling Wood Work Wrought and Planed Fixed in Frames of Trusses upto a height of 5 m above Plinth Level as per Technical Specification Clause 202 | Cum | 565.80 |
| 2.9 (a) | Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per Technical Specification Clause 202Including dismembering | Tonne | 1,514.60 |
| 2.9 (b) | Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per Technical Specification Clause 202Excluding dismembering | Tonne | 1,045.40 |
| 2.9 (c) | Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per Technical Specification Clause 202Extra over Items (a) and (b) above for cutting rivets | Tonne | 11.90 |
| 2.11 (a) | Scraping of Stone from Dismantled Stone Masonry as per Technical Specification Clause 202In Cement or Lime Mortar | Cum | 455.20 |
| 2.12 | Scraping Plaster in Lime or Cement Mortar from Brick / Stone Masonry as per Technical Specification Clause 202 | Sqm | 14.40 |
| 2.14 I (a) | Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 — By Manual MeansBituminous Courses | Cum | 571.90 |
| 2.14 I (b) | Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 — By Manual MeansGranular Courses | Cum | 414.50 |
| 2.14 II (a) | Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 — By Mechanical MeansBituminous Courses | Cum | 234.60 |
| 2.15 | Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | Cum | 1,045.20 |
| 2.16 | Dismantling Guard RailsDismantling guard rails by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable materials separately as per Technical Specification Clause 202 | Metre | 62.40 |
| 2.17 | Dismantling Kerb StonesDismantling kerb stones by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per Technical Specification Clause 202 | Metre | 11.80 |
| 2.18 | Dismantling Kerb Stone ChannelsDismantling kerb stone channels by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per Technical Specification Clause 202 | Metre | 18.20 |
| 2.19 (a) | Dismantling Kilometre Stones Dismantling of kilometre stones including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and backfilling of pit as per Technical Specification Clause 2025th km Stone | Each | 311.90 |
| 2.19 (b) | Dismantling Kilometre Stones Dismantling of kilometre stones including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and backfilling of pit as per Technical Specification Clause 202Ordinary km Stones | Each | 196.40 |
| 2.20 | Dismantling of FencingDismantling of barbed wire fencing / wire mesh fencing including posts, foundation concrete, backfilling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m, stacking serviceable material and unserviceable material separately as per Technical Specification Clause 202 | Metre | 49.50 |
| 2.21 | Dismantling of CI Water Pipe LineDismantling of CI water pipe line 600 mm dia including disposal with all lifts and lead upto 1000 m and stacking of serviceable material and unserviceable material separately under supervision of concerned department as per Technical Specification Clause 202 | Metre | 119.00 |
| 2.22 | Removal of Cement Concrete Pipe of Sewer GutterRemoval of cement concrete pipe of sewer gutter 1500 mm dia under the supervision of concerned department including disposal with all lifts and upto a lead of 1000 m and stacking of serviceable and unserviceable material separately but excluding earth excavation and dismantling of masonry works as per Technical Specification Clause 202 | Metre | 196.90 |
| 2.23 | Removal of Telephone/Electric Poles and LinesRemoval of telephone/electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per Technical Specification Clause 202 | Each | 165.80 |
Other chapters in this schedule
- Carriage of Materials (22)
- Earthwork, Erosion Control and Drainage (32)
- Granular Sub-Bases, Bases (Non-Bituminous) and Shoulders (27)
- Bases and Surface Courses (Bituminous) (47)
- Cement Concrete Pavement (14)
- Hill Roads (18)
- Traffic Signs, Markings and Other Road Appurtenances (22)
- Foundation (33)
- Substructure (40)
- Superstructure (71)
- Protection Works (25)
- Maintenance of Roads (19)
- Miscellaneous Works (109)
- Major Roads & Bridge Works (MoRT&H Specification) (454)
- New Technology (42)
Pricing site clearance and setting out against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works