Carriage of Materials rates

22 carriage of materials items from the Assam PWD (Roads), effective 2020-12-31.

Carriage of Materials rates in the Assam Schedule of Rates for Rural Roads 2020-21 run from ₹35.40 to ₹1,706.00. Transcribed from Government of Assam, Public Works Roads Department — Schedule of Rates for Rural Roads, 2020-21. Built on the MoRD/IRC Standard Data Book for Analysis of Rates for Rural Roads; Part D additionally covers major roads and bridge works to MoRT&H specification.. Reference only — verify against the official source before pricing a bid.

22 items — scroll the table to browse

DescriptionUnit
1.1 (i)Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual MeansLoading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 mCum113.80
1.1 (ii)Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual MeansLoading of Earth, Sand, Moorum, Manure, Flyash by manual means including a lead upto 30 mCum56.90
1.1 (iii)Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual MeansUnloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 mCum56.90
1.1 (iv)Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual MeansUnloading of Earth,Sand, Moorum,Manure,Fly ash, by manual means including lead upto 30MCum35.40
1.2 (i)Loading and Unloading Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Mechanical MeansLoading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by mechanical means including a lead upto 30 mCum63.40
1.4 (i)Loading and Unloading of Cement by Manual MeansLoading of Cement by manual means including a lead upto 30 mTonne707.00
1.4 (ii)Loading and Unloading of Cement by Manual MeansUnloading of Cement by manual means including a lead upto 30 mTonne141.40
1.5 (i)Loading and Unloading of Structural Steel and Steel Bars by manual meansLoading of Structural Steel, Steel Bars by manual means including a lead upto 30 mTonne151.00
1.5 (ii)Loading and Unloading of Structural Steel and Steel Bars by manual meansUnloading of Structural Steel, Steel Bars by manual means including a lead upto 30 mTonne151.00
1.6 (i)Loading and Unloading of Bitumen Drums by Manual MeansLoading of Bitumen Drums by manual means including a lead upto 30 mTonne167.70
1.6 (ii)Loading and Unloading of Bitumen Drums by Manual MeansUnloading of Bitumen Drums by Manual Means including a lead upto 30 mTonne155.00
1.7 (i)Loading and Unloading of Timber by Manual MeansLoading of Timber by manual means including a lead upto 30 mTonne250.40
1.7 (ii)Loading and Unloading of Timber by Manual MeansUnloading of Timber by manual means including a lead upto 30 mTonne250.40
1.8 (i)Loading and Unloading of C.C. Blocks, Kerb, etcLoading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb, Channel, Bond Stone, etc. by manual means including a lead upto 30 mCum370.90
1.8 (ii)Loading and Unloading of C.C. Blocks, Kerb, etcUnloading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb, Channel, Bond Stone, etc. by manual means including a lead upto 30 mCum370.90
1.11 (i)Supply of Quarried stone and hand breakingSupply of quarried stone and hand breaking into coarse aggregate to Grading 1 (90 mm to 45 mm) as per Table 400.8 of Technical SpecificationsCum1,500.00
1.11 (ii)Supply of Quarried stone and hand breakingSupply of quarried stone and hand breaking into coarse aggregate to Grading 2 (63 mm to 45 mm) as per Table 400.8 of Technical SpecificationsCum1,597.00
1.11 (iii)Supply of Quarried stone and hand breakingSupply of quarried stone and hand breaking into coarse aggregate to Grading 3 (53 mm to 22.4 mm) as per Table 400.8 of Technical SpecificationsCum1,694.00
1.12Crushing of Stone Aggregates 100 per cent passing through 53 mm sieve as per Table 500.6 of Technical SpecificationsCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates 100 per cent passing through 53 mm sieve as per Table 500.6 of Technical Specifications including the cost of stoneCum1,249.30
1.13Crushing of Stone Aggregates 100 per cent passing through 22.4 mm sieve as per Table 500.6 of Technical SpecificationsCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates 100 per cent passing through 22.4 mm sieve as per Table 500.6 of Technical Specifications including the cost of stoneCum1,447.70
1.14Crushing of Stone Aggregates Nominal Size 13.2 mm as per Table 500.9 of Technical SpecificationsCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 13.2 mm nominal siize as per TTabblle 550000.99 off TTechhniicall SSpeciiffiicatiions iinclluddiing thhe cost off stoneCum1,706.00
1.15Crushing of Stone Aggregates 9.5 mm Nominal Size as per Table 500.9 of Technical SpecificationsCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 9.5 mm nominal size as per Table 500.9 of Technical Specifications including the cost of stoneCum1,706.00

Pricing carriage of materials against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.