Skip to main content
R/DAR 2023

Providing and fixing aluminium extruded section body tubular type universal hydraulic door closer (having brand logo with ISi, IS : 3564, embossed on the body, door weight upto 36 kg to 80 kg and door width from 701 mm to 1000 mm), with double speed adjustment with necessary accessories and screws etc. complete

Item number
9.84
Analysis basis
10 nos
Priced inputs
4
Derived rate
₹983.15/ NO
D-01/RATE ANALYSISITEM 9.84

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.84 (Providing and fixing aluminium extruded section body tubular type universal hydraulic door closer (having brand logo with ISi, IS : 3564, embossed on the body, door weight upto 36 kg to 80 kg and door width from 701 mm to 1000 mm), with double speed adjustment with necessary accessories and screws etc. complete) is derived from 4 priced inputs for 10 nos and works out to ₹983.15 per no after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 9.84DETAILS OF COST FOR 10 NOS
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7060MATHydraulic door closer tubular type Aluminium section bodyeach10600.006,000.00
0451MATBrass screws 30 mm100 Nos0.6154.0092.40
9977MATCarriage of materialL.S.1.042.272.36
0112LABCarpenter 2nd classday1816.00816.00
BUILD-UP TO RATE
TOTAL
6,910.76
Add 1 % Water charges on “W”
+69.11
TOTAL
6,979.87
Add GST on “X” (multiplying factor 0.2127)
+1,484.62
TOTAL
8,464.49
Add 15% CPOH on “Y”
+1,269.67
TOTAL
9,734.16
Add Cess @ 1% on “Z”
+97.34
Cost of 10 nos
9,831.50
Cost of 1 no
983.15
SAY
₹983.15
D-02/SOURCEPRINTED PAGE 550
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
550

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 550. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSWOOD AND PVC WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.