Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete

125x64x1.90 mm
Item number
9.70.1
Analysis basis
10 nos
Priced inputs
5
Derived rate
₹118.20/ NO
D-01/RATE ANALYSISITEM 9.70.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.70.1 (Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 125x64x1.90 mm) is derived from 5 priced inputs for 10 nos and works out to ₹118.20 per no after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 9.70.1DETAILS OF COST FOR 10 NOS
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
8215MATStainless steel butt hinges 125x64x1.9 mm IS : 12817 marked10 Nos1388.00388.00
8210MATStainless steel screws 50 mm100 Nos0.8320.00256.00
9977MATCarriage of materialsL.S.2.732.276.20
0112LABCarpenter 2nd classday0.14816.00114.24
0114LABBeldarday0.09736.0066.24
BUILD-UP TO RATE
TOTAL
830.68
Add 1 % Water charges on “W”
+8.31
TOTAL
838.99
Add GST on “X” (multiplying factor 0.2127)
+178.45
TOTAL
1,017.44
Add 15% CPOH on “Y”
+152.62
TOTAL
1,170.06
Add Cess @ 1% on “Z”
+11.70
Cost of 10 nos.
1,181.76
Cost of 1 no
118.18
SAY
₹118.20
D-02/SOURCEPRINTED PAGE 531
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
531

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 531. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.