Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete

100X58X1.90 mm
Item number
9.70.2
Analysis basis
10 nos
Priced inputs
5
Derived rate
₹107.10/ NO
D-01/RATE ANALYSISITEM 9.70.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.70.2 (Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 100X58X1.90 mm) is derived from 5 priced inputs for 10 nos and works out to ₹107.10 per no after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 9.70.2DETAILS OF COST FOR 10 NOS
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
8216MATStainless steel butt hinges 100x58x1.9 mm IS : 12817 marked10 Nos1350.00350.00
8211MATStainless steel screws 40 mm100 Nos0.8270.00216.00
9977MATCarriage of materialsL.S.2.732.276.20
0112LABCarpenter 2nd classday0.14816.00114.24
0114LABBeldarday0.09736.0066.24
BUILD-UP TO RATE
TOTAL
752.68
Add 1 % Water charges on “W”
+7.53
TOTAL
760.21
Add GST on “X” (multiplying factor 0.2127)
+161.70
TOTAL
921.91
Add 15% CPOH on “Y”
+138.29
TOTAL
1,060.20
Add Cess @ 1% on “Z”
+10.60
Cost of 10 nos.
1,070.80
Cost of 1 no
107.08
SAY
₹107.10
D-02/SOURCEPRINTED PAGE 532
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
532

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 532. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.