Providing and fixing ISI marked, IS : 1341, M.S. heavy weight bright finished butt hinges with necessary screws etc. complete
- Item number
- 9.56.2
- Analysis basis
- ten hinges
- Priced inputs
- 5
- Derived rate
- ₹62.05/ NO
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.56.2 (Providing and fixing ISI marked, IS : 1341, M.S. heavy weight bright finished butt hinges with necessary screws etc. complete : 100x75x3.50 mm) is derived from 5 priced inputs for ten hinges and works out to ₹62.05 per no after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 8223 | MAT | M.S. heavy weight butt hinges 100x75x3.5 mm IS: 1341 marked | 10 Nos | 1 | 200.00 | 200.00 |
| 0637 | MAT | Bright finished or black enamelled mild steel screws 40 mmBright finished or black enameled mild steel screws 40 mm | 100 Nos | 0.8 | 62.00 | 49.60 |
| 9977 | MAT | Carriage of materials | L.S. | 2.73 | 2.27 | 6.20 |
| 0112 | LAB | Carpenter 2nd class | day | 0.14 | 816.00 | 114.24 |
| 0114 | LAB | Beldar | day | 0.09 | 736.00 | 66.24 |
- TOTAL
- 436.28
- Add 1 % Water charges on “W”
- +4.36
- TOTAL
- 440.64
- Add GST on “X” (multiplying factor 0.2127)
- +93.72
- TOTAL
- 534.36
- Add 15% CPOH on “Y”
- +80.15
- TOTAL
- 614.51
- Add Cess @ 1% on “Z”
- +6.15
- Cost of 10 nos.
- 620.66
- Cost of 1 no
- 62.07
- SAY
- ₹62.05
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 512
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 512. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.