Providing and fixing ISI marked, IS : 1341, M.S. heavy weight bright finished butt hinges with necessary screws etc. complete
- Item number
- 9.56.1
- Analysis basis
- ten hinges
- Priced inputs
- 5
- Derived rate
- ₹71.25/ NO
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.56.1 (Providing and fixing ISI marked, IS : 1341, M.S. heavy weight bright finished butt hinges with necessary screws etc. complete : 125x90x4.00 mm) is derived from 5 priced inputs for ten hinges and works out to ₹71.25 per no after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 8222 | MAT | M.S. heavy weight but hinges 125x90x4.0mm IS : 1341 markedM.S. heavy weight butt hinges 125x90x4.0 mm IS: 1341 marked. | 10 Nos | 1 | 250.00 | 250.00 |
| 0635 | MAT | Bright finished or black enamelled mild steel screws 50 mmBright finished or black enameled mild steel screws 50 mm | 100 Nos | 0.8 | 80.00 | 64.00 |
| 9977 | MAT | Carriage of materials | L.S. | 2.73 | 2.27 | 6.20 |
| 0112 | LAB | Carpenter 2nd class | day | 0.14 | 816.00 | 114.24 |
| 0114 | LAB | Beldar | day | 0.09 | 736.00 | 66.24 |
- TOTAL
- 500.68
- Add 1 % Water charges on “W”
- +5.01
- TOTAL
- 505.69
- Add GST on “X” (multiplying factor 0.2127)
- +107.56
- TOTAL
- 613.25
- Add 15% CPOH on “Y”
- +91.99
- TOTAL
- 705.24
- Add Cess @ 1% on “Z”
- +7.05
- Cost of 10 nos.
- 712.29
- Cost of 1 no
- 71.23
- SAY
- ₹71.25
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 511
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 511. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.