Providing beams including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete with
- Item number
- 9.54.1
- Analysis basis
- a beam
- Priced inputs
- 6
- Derived rate
- ₹1,03,140.10/ CUM
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.54.1 (Providing beams including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete with : Sal wood) is derived from 6 priced inputs for a beam and works out to ₹1,03,140.10 per cum after water charges, GST, CPOH and cess. The full build-up is below.
- 0.203cum. or 203cudm.
- Sal wood = 203 cudm.+
- Total = 207.06cudm. Say 207.1 cudm.
- Priming coat (wood preservative)
- Add wastage @ 2% = 4.06cudm.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 1199 | MAT | Sal wood in scantling | 10 cudm | 20.71 | 600.00 | 12,426.00 |
| SUB | Rate as per item no 13.57.1 SH : FinishingRate as per item 13.57.1 | sqm | 0.54 | 54.40 | 29.38 | |
| 0112 | LAB | Carpenter 2nd class | day | 0.7 | 816.00 | 571.20 |
| 0114 | LAB | Beldar | day | 1.45 | 736.00 | 1,067.20 |
| 0100 | LAB | Bandhani | day | 0.7 | 816.00 | 571.20 |
| 9999 | MAT | Sundries | L.S. | 26.91 | 2.27 | 61.09 |
- TOTAL
- 14,726.07
- Add 1 % Water charges on “W-A”
- +146.97
- TOTAL
- 14,873.04
- Add GST on “X-A” (multiplying factor 0.2127)
- +3,157.25
- TOTAL
- 18,030.29
- Add 15% CPOH on “Y-A”
- +2,700.14
- TOTAL
- 20,730.43
- Add Cess @ 1% on “Z-A”
- +207.01
- Cost for 203 cudm.
- 20,937.44
- Cost of 1 cum.
- 1,03,140.10
- SAY
- ₹1,03,140.10
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 508
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 508. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.