CPWD Analysis of Rates · Wood and PVC Work

Providing and fixing 18mm thick both sides Pre-laminated cement bonded wood particle board as per IS : 15786:2008 of approved brand and shade with suitable full threaded steel screws etc. in partitions, boxes, shelves, racks and cupboard, kitchen cabinet under kitchen counter etc. all complete as per direction of Engineer-in-charge (Note: Fittings to be paid separately)

18 mm thick

Item number
9.166.1
Analysis basis
Details of cost for 4 nos.
Priced inputs
5
Derived rate
1,362.30 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.166.1 Providing and fixing 18mm thick both sides Pre-laminated cement bonded wood particle board as per IS : 15786:2008 of approved brand and shade with suitable full threaded steel screws etc. in partitions, boxes, shelves, racks and cupboard, kitchen cabinet under kitchen counter etc. all complete as per direction of Engineer-in-charge (Note: Fittings to be paid separately) 18 mm thick — is derived from 5 priced inputs for 4 nos and works out to ₹1,362.30 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • 75x20cm shelves = 0.60 sqm.
  • 18mm thick particle board
  • 4x75x20cm = 0.60sqm.
  • Total = 0.63 sqm
  • Add wastage @ 5% = 0.03sqm.
CodeInputUnitQuantityRate (INR)Amount (INR)
249518mm thick both sides Pre-laminated cement bonded wood particle board as per IS : 15786:200818 mm thick both sides Pre-laminated cement bonded wood particle board as per IS : 15786:2008Materialsqm0.63668.00420.84
9977Carriage of boardMaterialL.S.0.912.272.07
0112Carpenter 2nd classLabourday0.11816.0089.76
0114BeldarLabourday0.06736.0044.16
9999Sundries, Painting edges & ScrewsMaterialL.S.7.82.2717.71
TOTAL
574.54
Add 1 % Water charges on “W”
5.75
TOTAL
580.29
Add GST on “X” (multiplying factor 0.2127)
123.43
TOTAL
703.72
Add 15% CPOH on “Y”
105.56
TOTAL
809.28
Add Cess @ 1% on “Z”
8.09
Cost of 0.60 sqm.
817.37
Cost of 1 sqm
1,362.28
Say
1,362.30

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 705. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.