Providing and fixing frame work for partitions/ wall lining etc. made of 50x50x1.6 mm hollow MS tube, placed along the walls, ceiling and floor in a grid pattern with spacing @ 60 cm centre to centre both ways (vertically & horizontally) or at required spacing near opening, with necessary welding at junctions and fixing the frame to wall/ ceiling/ floors with steel dash fasteners of 8 mm dia, 75 mm long bolt, including making provision for opening for doors, windows, electrical conduits, switch boards etc., including providing with two coats of approved steel primer etc. complete, all as per direction of Engineer-in-charge

Item number
9.154
Analysis basis
Details of cost for 2.4x2.4 m panel=5.76m
Priced inputs
8
Derived rate
166.80 / kg

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.154 Providing and fixing frame work for partitions/ wall lining etc. made of 50x50x1.6 mm hollow MS tube, placed along the walls, ceiling and floor in a grid pattern with spacing @ 60 cm centre to centre both ways (vertically & horizontally) or at required spacing near opening, with necessary welding at junctions and fixing the frame to wall/ ceiling/ floors with steel dash fasteners of 8 mm dia, 75 mm long bolt, including making provision for opening for doors, windows, electrical conduits, switch boards etc., including providing with two coats of approved steel primer etc. complete, all as per direction of Engineer-in-charge — is derived from 8 priced inputs for 2.4x2.4 m and works out to ₹166.80 per kg after water charges, GST, CPOH and cess. The full build-up is below.

  • or 58.35 Kg
  • MATERIAL ²
  • M.S.Pipe section @ 10.13 kg/sqm=58.35 Kg+
  • Total = 61.27 Kg
  • Steel primer
  • 5 x 2 x 2.40 x 0.05 x 4 = 4.80 sqm
  • Add 5% wastage = 2.92 Kg
CodeInputUnitQuantityRate (INR)Amount (INR)
4009Mild steel tubes hot finished welded typeMaterialkilogram61.2772.004,411.44
8776Stainless steel dash fastener of 8 mm dia and 75 mm long boltMaterialeach2019.00380.00
Rate as per Item No.13.50.3 of SH:FINISHINGRate as per item 13.50.3Sub-analysissqm4.867.40323.52
0116Fitter (grade 1)Labourday0.4897.00358.80
0103Blacksmith 2nd classLabourday0.53816.00432.48
0114BeldarLabourday1.23736.00905.28
0100BandhaniLabourday0.06816.0048.96
9999SundriesMaterialL.S.33.562.2776.18
TOTAL
6,936.66
Add 1 % Water charges on “W-A”
66.13
TOTAL
7,002.79
Add GST on “X-A” (multiplying factor 0.2127)
1,420.68
TOTAL
8,423.47
Add 15% CPOH on “Y-A”
1,214.99
TOTAL
9,638.46
Add Cess @ 1% on “Z-A”
93.15
Cost of 58.35 kg
9,731.61
Cost of 1 kg
166.78
Say
166.80

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 693. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works