Skip to main content

CPWD Analysis of Rates · Wood and PVC Work

Providing and fixing fly proof stainless steel grade 304 wire gauge, to windows and clerestory windows using wire gauge with average width of aperture 1.4 mm in both directions with wire of dia. 0.50 mm all complete

With 12 mm mild steel U beading

Item number
9.135.2
Analysis basis
Details of cost for a window of size 140x110cm
Priced inputs
6
Derived rate
1,228.00 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.135.2 Providing and fixing fly proof stainless steel grade 304 wire gauge, to windows and clerestory windows using wire gauge with average width of aperture 1.4 mm in both directions with wire of dia. 0.50 mm all complete With 12 mm mild steel U beading — is derived from 6 priced inputs for a window and works out to ₹1,228.00 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • =1.54sqm.
  • Wire gauze -20x60mm mesh 3.2mm wide =
  • 1.4x1.1m = 1.54sqm.+
  • Total = 1.69 sqm.
  • Add wastage @ 10% = 0.15sqm.
CodeInputUnitQuantityRate (INR)Amount (INR)
8737Stainless steel wire guage (Grade-304) aperture 1.4mm and 0.50 mm dia wireStainless steel wire guage (Grade-304) aperture 1.4 mm and 0.50 mm dia wireMaterialsqm1.69445.00752.05
9977Carriage of wire fabricMaterialL.S.1.822.274.13
734912 mm M.S. ‘U’ beadingMaterialmetre515.0075.00
0112Carpenter 2nd classLabourday0.33816.00269.28
0114BeldarLabourday0.25736.00184.00
9999SundriesMaterialL.S.19.762.2744.86
TOTAL
1,329.32
Add 1 % Water charges on “W”
13.29
TOTAL
1,342.61
Add GST on “X” (multiplying factor 0.2127)
285.57
TOTAL
1,628.18
Add 15% CPOH on “Y”
244.23
TOTAL
1,872.41
Add Cess @ 1% on “Z”
18.72
Cost of 1.54 sqm.
1,891.13
Cost of 1 sqm.
1,228.01
Say
1,228.00

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 618. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works