Providing and fixing aluminum U beading of required size to Pre-laminated/flush door shutter, including fixing etc. complete as per direction of Engineer-in-charge
- Item number
- 9.132
- Analysis basis
- Details of cost for 1kg.
- Priced inputs
- 3
- Derived rate
- ₹596.15
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.132 (Providing and fixing aluminum U beading of required size to Pre-laminated/flush door shutter, including fixing etc. complete as per direction of Engineer-in-charge) is derived from 3 priced inputs and works out to ₹596.15 after water charges, GST, CPOH and cess. The full build-up is below.
- Aluminum U beading = 1.00kg +
- Total = 1.10kg.
- Add 10% wastage = 0.10
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 7449 | MAT | Aluminium U beading | kilogram | 1.1 | 220.00 | 242.00 |
| 9999 | MAT | Anodized 15 micron | L.S. | 65 | 2.27 | 147.55 |
| 9999 | MAT | Sundries including screws, fixing, carriage etc. | L.S. | 13 | 2.27 | 29.51 |
- TOTAL
- 419.06
- Add 1 % Water charges on “W”
- +4.19
- TOTAL
- 423.25
- Add GST on “X” (multiplying factor 0.2127)
- +90.03
- TOTAL
- 513.28
- Add 15% CPOH on “Y”
- +76.99
- TOTAL
- 590.27
- Add Cess @ 1% on “Z”
- +5.90
- Cost for 1 kg.
- 596.17
- SAY
- ₹596.15
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 603
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 603. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.