Providing and fixing sliding arrangement in racks/ cupboards/cabinets shutter with stainless steel rollers to run inside C or E aluminium channel section (The payment of C or E channel shall be made separately)
- Item number
- 9.116
- Analysis basis
- 1 No
- Priced inputs
- 2
- Derived rate
- ₹20.40/ NO
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.116 (Providing and fixing sliding arrangement in racks/ cupboards/cabinets shutter with stainless steel rollers to run inside C or E aluminium channel section (The payment of C or E channel shall be made separately)) is derived from 2 priced inputs for 1 No and works out to ₹20.40 per no after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 8704 | MAT | Stainless steel roller for sliding arrangment in racks/ cupboards/ cabinets shutterStainless steel roller for sliding arrangement in racks/ cupboards/ cabinets shutter | each | 1 | 12.00 | 12.00 |
| 9999 | MAT | Labour for fixing | L.S. | 1.04 | 2.27 | 2.36 |
- TOTAL
- 14.36
- Add 1 % Water charges on “W”
- +0.14
- TOTAL
- 14.50
- Add GST on “X” (multiplying factor 0.2127)
- +3.08
- TOTAL
- 17.58
- Add 15% CPOH on “Y”
- +2.64
- TOTAL
- 20.22
- Add Cess @ 1% on “Z”
- +0.20
- Cost for 1 No.
- 20.42
- SAY
- ₹20.40
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 587
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 587. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.