CPWD Analysis of Rates · Wood and PVC Work
Providing and fixing sliding arrangement in racks/ cupboards/cabinets shutter with stainless steel rollers to run inside C or E aluminium channel section (The payment of C or E channel shall be made separately)
- Item number
- 9.116
- Analysis basis
- Details of cost for 1 No.
- Priced inputs
- 2
- Derived rate
- ₹20.40 / No
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.116 — Providing and fixing sliding arrangement in racks/ cupboards/cabinets shutter with stainless steel rollers to run inside C or E aluminium channel section (The payment of C or E channel shall be made separately) — is derived from 2 priced inputs for 1 No and works out to ₹20.40 per no after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 8704 | Stainless steel roller for sliding arrangment in racks/ cupboards/ cabinets shutterStainless steel roller for sliding arrangement in racks/ cupboards/ cabinets shutterMaterial | each | 1 | 12.00 | 12.00 |
| 9999 | Labour for fixingMaterial | L.S. | 1.04 | 2.27 | 2.36 |
- TOTAL
- 14.36
- Add 1 % Water charges on “W”
- 0.14
- TOTAL
- 14.50
- Add GST on “X” (multiplying factor 0.2127)
- 3.08
- TOTAL
- 17.58
- Add 15% CPOH on “Y”
- 2.64
- TOTAL
- 20.22
- Add Cess @ 1% on “Z”
- 0.20
- Cost for 1 No.
- 20.42
- Say
- 20.40
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 587. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.