Skip to main content
R/DAR 2023

Providing and fixing magnetic catcher of approved quality in cupboard / ward robe shutters, including fixing with necessary screws etc. complete

Double strip (horizontal type)
Item number
9.114.2
Analysis basis
1 no
Priced inputs
2
Derived rate
₹39.70/ NO
D-01/RATE ANALYSISITEM 9.114.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.114.2 (Providing and fixing magnetic catcher of approved quality in cupboard / ward robe shutters, including fixing with necessary screws etc. complete Double strip (horizontal type)) is derived from 2 priced inputs for 1 no and works out to ₹39.70 per no after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 9.114.2DETAILS OF COST FOR 1 NO
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
8715MATMagenatic catcher double strip horizontal type.Magnetic catcher double strip horizontal typeeach122.0022.00
9999MATSundries including screws and fixing charges.L.S.2.62.275.90
BUILD-UP TO RATE
TOTAL
27.90
Add 1 % Water charges on “W”
+0.28
TOTAL
28.18
Add GST on “X” (multiplying factor 0.2127)
+5.99
TOTAL
34.17
Add 15% CPOH on “Y”
+5.13
TOTAL
39.30
Add Cess @ 1% on “Z”
+0.39
Cost for 1 No.
39.69
SAY
₹39.70
D-02/SOURCEPRINTED PAGE 586
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
586

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 586. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSWOOD AND PVC WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.