Providing and fixing wooden moulded corner beading of triangular shape to the junction of panelling etc. with iron screws, plugs and priming coat on unexposed surface etc. complete 2nd class teak wood

50x50 mm (base and height)

Item number
9.111.1
Analysis basis
Details of cost for beading = 5.00 m
Priced inputs
4
Derived rate
354.35

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.111.1 Providing and fixing wooden moulded corner beading of triangular shape to the junction of panelling etc. with iron screws, plugs and priming coat on unexposed surface etc. complete 2nd class teak wood 50x50 mm (base and height) — is derived from 4 priced inputs and works out to ₹354.35 after water charges, GST, CPOH and cess. The full build-up is below.

  • Teak wood 2nd class in planks 500 x 5 x 5 mm
  • / 2 = 0.000625 cum + Add wastage @ 10% =
  • 0.00063. Total = 0.00688 cum say 6.88 cudm
  • Priming coat
  • Area 5.0 x (.05 +.05) = 0.50 sqm
  • For plaining, fixing & making design
CodeInputUnitQuantityRate (INR)Amount (INR)
1190Second class teak wood in planksMaterial10 cudm0.688791.00544.21
0637Bright finished or black enamelled mild steel screws 40 mmBright finished or black enameled mild steel screws 40 mmMaterial100 Nos0.0662.003.72
Rate as per item no 13.85.1 of SH : FinishingRate as per item 13.85.1Sub-analysissqm0.570.3535.18
0111Carpenter 1st classLabourday0.75897.00672.75
TOTAL
1,255.86
Add 1 % Water charges on “W-A”
12.21
TOTAL
1,268.07
Add GST on “X-A” (multiplying factor 0.2127)
262.24
TOTAL
1,530.31
Add 15% CPOH on “Y-A”
224.27
TOTAL
1,754.58
Add Cess @ 1% on “Z-A”
17.19
Cost for 5 metre
1,771.77
Cost for 1 metre
354.35
Say
354.35

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 584. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.