Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work

80 mm nominal dia Pipes

Item number
18.9.8
Analysis basis
Details of cost for 10 metre
Priced inputs
5
Derived rate
2,166.35 / metre

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.9.8 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 80 mm nominal dia Pipes — is derived from 5 priced inputs for 10 metre and works out to ₹2,166.35 per metre after water charges, GST, CPOH and cess. The full build-up is below.

  • 30 x P / 100
  • Trenching and refilling etc.
CodeInputUnitQuantityRate (INR)Amount (INR)
8643Chlorinated Polyvinyl - chloride (CPVC) pipe 80 mm nominal diaMaterialmetre101,042.0010,420.00
0116Fitter (grade 1)Labourday0.25897.00224.25
0114BeldarLabourday0.66736.00485.76
0114BeldarLabourday0.66736.00485.76
0115CoolieLabourday0.66736.00485.76
Add 30% for fittings and wastage etc. on (P)
3,126.00
TOTAL
15,227.53
Add 1 % Water charges on “W”
152.28
TOTAL
15,379.81
Add GST on “X” (multiplying factor 0.2127)
3,271.29
TOTAL
18,651.10
Add 15% CPOH on “Y”
2,797.67
TOTAL
21,448.77
Add Cess @ 1% on “Z”
214.49
Cost of 10 metre
21,663.26
Cost of 1 metre
2,166.33
Say
2,166.35

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1424. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.