CPWD Analysis of Rates · Water Supply

Cutting holes up to 15x15 cm in R.C.C. floors and roofs for passing drain pipe etc. and repairing the hole after insertion of drain pipe etc. with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete so as to make it leak proof

Item number
18.77
Analysis basis
Details of cost for 10 holes
Priced inputs
7
Derived rate
452.00 / hole

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.77 Cutting holes up to 15x15 cm in R.C.C. floors and roofs for passing drain pipe etc. and repairing the hole after insertion of drain pipe etc. with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete so as to make it leak proof — is derived from 7 priced inputs for 10 holes and works out to ₹452.00 per hole after water charges, GST, CPOH and cess. The full build-up is below.

  • Average size 15x15x15 cm
  • Labour for cutting holes
  • Cement concrete 1:2:4 (1 cement: 2
  • coarse sand ; 4 graded stone aggregate
  • 20 mm nominal size)
  • 10x0.15x0.15x0.15 m = 0.033 cum
  • Les 33% for pipe etc. = (-) 0.011 cum
  • = 0.022 cum Say 0.0.02 cum
CodeInputUnitQuantityRate (INR)Amount (INR)
0123Mason 1st classMason 1st classLabourday0.83897.00744.51
0124Mason 2nd classMason 2nd classLabourday0.83816.00677.28
0114BeldarLabourday1.67736.001,229.12
Rate as per item no. 4.1.3 of SH : concrete WorkRate as per item 4.1.3Sub-analysiscum0.027,878.50157.57
9999Finishing top and bottom and making the holes leak proofMaterialL.S.121.162.27275.03
9999Add for delayMaterialL.S.40.32.2791.48
9999SundriesMaterialL.S.21.582.2748.99
TOTAL
3,223.98
Add 1 % Water charges on “W-A”
30.66
TOTAL
3,254.64
Add GST on “X-A” (multiplying factor 0.2127)
658.75
TOTAL
3,913.39
Add 15% CPOH on “Y-A”
563.37
TOTAL
4,476.76
Add Cess @ 1% on “Z-A”
43.19
Cost of 10 holes
4,519.95
Cost of 1 hole
452.00
Say
452.00

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1566. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works