Skip to main content

CPWD Analysis of Rates · Water Supply

Providing, laying, jointing and testing S&S Centrifugally Cast Ductile Iron double chamber Class K-9 pressure pipes conforming to IS 8329:2000 with restrained joints (bolt less), all complete

400 mm nominal dia pipe

Item number
18.72A.7
Analysis basis
Details of cost for 10 metre
Priced inputs
6
Derived rate
8,279.45 / metre

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.72A.7 Providing, laying, jointing and testing S&S Centrifugally Cast Ductile Iron double chamber Class K-9 pressure pipes conforming to IS 8329:2000 with restrained joints (bolt less), all complete 400 mm nominal dia pipe — is derived from 6 priced inputs for 10 metre and works out to ₹8,279.45 per metre after water charges, GST, CPOH and cess. The full build-up is below.

  • 400 mm dia Centrifugally Cast Ductile Iron
  • restrained joint class K9 pipes (in 5.5 m
  • lengths)
  • Weight of 1 m pipes = 99.54 Kg
  • Weight of 10 m pipes = 995.4 Kg
  • Labour for laying and jointing
CodeInputUnitQuantityRate (INR)Amount (INR)
7597Centrifugally Cast DI class K9 pipe including double chamber restraining arrangements (bolt less) 400 mm nominal dia pipeCentrifugally Cast DI class K9 pipe including double chamber restraining arrangements (bolt less) 400 mm nominal dia pipeMaterialmetre105,576.0055,760.00
7612Rubber Gasket of EPDM quality for 400 mm nominal dia pipeRubber Gasket of EPDM quality for 400 mm nominal dia pipeMaterialeach2210.00420.00
0116Fitter (grade 1)Labourday0.22897.00197.34
0117Assistant Fitter or 2nd class FitterLabourday0.46816.00375.36
0114BeldarLabourday1.9736.001,398.40
9999SundriesMaterialL.S.20.62.2746.76
TOTAL
58,197.86
Add 1 % Water charges on “W”
581.98
TOTAL
58,779.84
Add GST on “X” (multiplying factor 0.2127)
12,502.47
TOTAL
71,282.31
Add 15% CPOH on “Y”
10,692.35
TOTAL
81,974.66
Add Cess @ 1% on “Z”
819.75
Cost of 10 metre
82,794.41
Cost of 1.00 metre
8,279.44
Say
8,279.45

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1553. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works