CPWD Analysis of Rates · Water Supply
Providing and laying Class K-12 Ductile Iron double chamber restrained joint (bolt less) specials such as tees, bends, collars, tapers and caps etc. conforming to IS 9523 including testing of joints all complete
Up to 600 mm nominal dia
- Item number
- 18.68A.1
- Analysis basis
- Details of cost for 1 quintal
- Priced inputs
- 2
- Derived rate
- ₹30,394.95 / quintal
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.68A.1 — Providing and laying Class K-12 Ductile Iron double chamber restrained joint (bolt less) specials such as tees, bends, collars, tapers and caps etc. conforming to IS 9523 including testing of joints all complete Up to 600 mm nominal dia — is derived from 2 priced inputs for 1 quintal and works out to ₹30,394.95 per quintal after water charges, GST, CPOH and cess. The full build-up is below.
- Ductile Iron restrain Jointed
- K - 12 specials suitable for push on
- jointing up to 600 mm dia
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 7589 | Ductile Iron double chamber restrained joint (bolt less) fittings class K12 upto 600 mm nominal diaDuctile Iron double chamber restrained joint (bolt less) fittings class K12 upto 600 mm nominal diaMaterial | quintal | 1 | 20,900.00 | 20,900.00 |
| Rate as per Item Number 18.24 of SH: Water SupplyRate as per item 18.24Sub-analysis | quintal | 1 | 661.85 | 661.85 |
- TOTAL
- 21,561.85
- Add 1 % Water charges on “W-A”
- 209.00
- TOTAL
- 21,770.85
- Add GST on “X-A” (multiplying factor 0.2127)
- 4,489.88
- TOTAL
- 26,260.73
- Add 15% CPOH on “Y-A”
- 3,839.83
- TOTAL
- 30,100.56
- Add Cess @ 1% on “Z-A”
- 294.39
- Cost of 1 quintal
- 30,394.95
- Say
- 30,394.95
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1522. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.