Skip to main content

CPWD Analysis of Rates · Water Supply

Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes conforming to IS:15801, UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R plain & brass threaded polypropylene random fittings and fixing the pipe with clamps at 1.00 m spacing. This includes testing of joints complete as per direction of Engineer-in-Charge. Internal Exposed on walls

PN - 16 Pipe, 20mm OD (SDR-7.4)

Item number
18.4.1
Analysis basis
Details of cost for 10 metre
Priced inputs
5
Derived rate
272.00 / metre

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.4.1 Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes conforming to IS:15801, UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R plain & brass threaded polypropylene random fittings and fixing the pipe with clamps at 1.00 m spacing. This includes testing of joints complete as per direction of Engineer-in-Charge. Internal Exposed on walls PN - 16 Pipe, 20mm OD (SDR-7.4) — is derived from 5 priced inputs for 10 metre and works out to ₹272.00 per metre after water charges, GST, CPOH and cess. The full build-up is below.

  • MATERIAL:
  • LABOUR:
CodeInputUnitQuantityRate (INR)Amount (INR)
8626Poly propyleneRandom - Co - Polymer (PPR) pipes PN-16 (SDR 7.4) - 20 mm Outer diaPoly propylene- Random - Co - Polymer (PPR) pipes PN-16 (SDR 7.4) - 20 mm Outer diaMaterialmetre1035.00350.00
9999Cement, Sand and gritMaterialL.S.2.732.276.20
0116Fitter (grade 1)Labourday0.33897.00296.01
0117Assistant Fitter or 2nd class FitterLabourday0.82816.00669.12
0114BeldarLabourday0.66736.00485.76
Add 30% for fittings, clamps and wastage etc. on P, 30xP/100
105.00
TOTAL
1,912.09
Add 1 % Water charges on “W”
19.12
TOTAL
1,931.21
Add GST on “X” (multiplying factor 0.2127)
410.77
TOTAL
2,341.98
Add 15% CPOH on “Y”
351.30
TOTAL
2,693.28
Add Cess @ 1% on “Z”
26.93
Cost of 10 metre
2,720.21
Cost of 1 metre
272.02
Say
272.00

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1403. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works