Painting G.I. pipes and fittings with synthetic enamel white paint with two coats over a ready mixed priming coat, both of approved quality for new work
- Item number
- 18.38.3
- Analysis basis
- 10 metre
- Priced inputs
- 3
- Derived rate
- ₹30.25/ METRE
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.38.3 (Painting G.I. pipes and fittings with synthetic enamel white paint with two coats over a ready mixed priming coat, both of approved quality for new work : 25 mm diameter pipe) is derived from 3 priced inputs for 10 metre and works out to ₹30.25 per metre after water charges, GST, CPOH and cess. The full build-up is below.
- Perimeter = 0.1061 metre
- Area = 10x0.1061 sqm. = 1.061 sqm.
- Priming coatPainting two coats excluding priming coat
- with white paint on new work.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| SUB | Rate as per item no 13.50.3 of SH : FinishingRate as per item 13.50.3 | sqm | 1.061 | 67.40 | 71.51 | |
| SUB | Rate as per item no 13.61.1 of SH : FinishingRate as per item 13.61.1 | sqm | 1.061 | 155.90 | 165.41 | |
| 9999 | MAT | Add for delay | L.S. | 20.28 | 2.27 | 46.04 |
- TOTAL
- 282.96
- Add 1 % Water charges on “W-A”
- +0.46
- TOTAL
- 283.42
- Add GST on “X-A” (multiplying factor 0.2127)
- +9.89
- TOTAL
- 293.31
- Add 15% CPOH on “Y-A”
- +8.46
- TOTAL
- 301.77
- Add Cess @ 1% on “Z-A”
- +0.65
- Cost of 10 metre
- 302.42
- Cost of one metre
- 30.24
- SAY
- ₹30.25
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1482
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1482. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.