CPWD Analysis of Rates · Water Supply
Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) : 300 mm diameter
Class II
- Item number
- 18.31.6.2
- Analysis basis
- Details of cost for 10 sluice valves
- Priced inputs
- 3
- Derived rate
- ₹30,203.00 / valve
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.31.6.2 — Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) : 300 mm diameter Class II — is derived from 3 priced inputs for 10 sluice and works out to ₹30,203.00 per valve after water charges, GST, CPOH and cess. The full build-up is below.
- Carriage of sluice valves
- wt. = 303.4x10=3034kg = 3.304t. Say
- 3.03 tonne.
- Providing flanged joints to sluice valves
- with bolts, nuts and rubber insertion etc.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 3326 | C.I.sluice valve (with caps) class II : 300 mm diaC.I. sluice valve (with caps) class II : 300 mm diaMaterial | each | 10 | 18,976.00 | 1,89,760.00 |
| (Rate as per item No. 18.24 Of SH: Water Supply)Rate as per item 18.24Sub-analysis | quintal | 30.34 | 661.85 | 20,080.53 | |
| (Rate as per item No.18.30.7 Of SH: Water Supply)Rate as per item 18.30.7Sub-analysis | each | 20 | 599.50 | 11,990.00 |
- TOTAL
- 2,21,830.53
- Add 1 % Water charges on “W-A”
- 1,897.60
- TOTAL
- 2,23,728.13
- Add GST on “X-A” (multiplying factor 0.2127)
- 40,765.57
- TOTAL
- 2,64,493.70
- Add 15% CPOH on “Y-A”
- 34,863.48
- TOTAL
- 2,99,357.18
- Add Cess @ 1% on “Z-A”
- 2,672.87
- Cost of 10 valves
- 3,02,030.05
- Cost of 1 valve
- 30,203.01
- Say
- 30,203.00
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1472. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.