CPWD Analysis of Rates · Water Supply
Laying in position S&S or flanged C.I. special such as tees, bends, collars, tapers and caps etc.(excluding cost of specials)
- Item number
- 18.24
- Analysis basis
- Details of cost for 7 quintal
- Priced inputs
- 4
- Derived rate
- ₹661.85 / quintal
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.24 — Laying in position S&S or flanged C.I. special such as tees, bends, collars, tapers and caps etc.(excluding cost of specials) — is derived from 4 priced inputs for 7 quintal and works out to ₹661.85 per quintal after water charges, GST, CPOH and cess. The full build-up is below.
- 10 Nos. Tee 200x150mm Weight = 70x10
- = 700kg.
- LABOUR for laying tee-
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 0116 | Fitter (grade 1)Labour | day | 0.93 | 897.00 | 834.21 |
| 0117 | Assistant Fitter or 2nd class FitterLabour | day | 0.62 | 816.00 | 505.92 |
| 0114 | BeldarLabour | day | 2.48 | 736.00 | 1,825.28 |
| 9999 | SundriesMaterial | L.S. | 40.17 | 2.27 | 91.19 |
- TOTAL
- 3,256.60
- Add 1 % Water charges on “W”
- 32.57
- TOTAL
- 3,289.17
- Add GST on “X” (multiplying factor 0.2127)
- 699.61
- TOTAL
- 3,988.78
- Add 15% CPOH on “Y”
- 598.32
- TOTAL
- 4,587.10
- Add Cess @ 1% on “Z”
- 45.87
- Cost of 7 quintal
- 4,632.97
- Cost of one quintal
- 661.85
- Say
- 661.85
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1448. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works