Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete

Kickers (320 mm wide, 5 mm thick)
Item number
22.4.3
Analysis basis
100 metres
Priced inputs
3
Derived rate
₹263.65/ METRES
D-01/RATE ANALYSISITEM 22.4.3

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 22.4.3 (Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : Kickers (320 mm wide, 5 mm thick)) is derived from 3 priced inputs for 100 metres and works out to ₹263.65 per metres after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 22.4.3DETAILS OF COST FOR 100 METRES
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7429MATKickersmetre100170.0017,000.00
0114LABBeldarday2736.001,472.00
9999MATSundries & wire etc.L.S.262.2759.02
BUILD-UP TO RATE
TOTAL
18,531.02
Add 1 % Water charges on “W”
+185.31
TOTAL
18,716.33
Add GST on “X” (multiplying factor 0.2127)
+3,980.96
TOTAL
22,697.29
Add 15% CPOH on “Y”
+3,404.59
TOTAL
26,101.88
Add Cess @ 1% on “Z”
+261.02
Cost for 100 metres
26,362.90
Cost for 1 metre
263.63
SAY
₹263.65
D-02/SOURCEPRINTED PAGE 1849
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1849

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1849. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.