CPWD Analysis of Rates · Stone Work
Coursed rubble masonry (second sort) with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand)
- Item number
- 7.7.1
- Analysis basis
- Details of cost for 1 cum
- Priced inputs
- 8
- Derived rate
- ₹8,198.55 / cum
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 7.7.1 — Coursed rubble masonry (second sort) with hard stone in foundation & plinth with : Cement mortar 1:6 (1 cement : 6 coarse sand) — is derived from 8 priced inputs for 1 cum and works out to ₹8,198.55 per cum after water charges, GST, CPOH and cess. The full build-up is below.
- Cement mortar 1 : 6 (1 cement : 6 coarse
- sand)
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| Rate as per Item Number 3.11 of SH: MortarsRate as per item 3.11Sub-analysis | cum | 0.3 | 3,541.40 | 1,062.42 | |
| 1157 | Stone for masonry workMaterial | cum | 1.1 | 1,250.00 | 1,375.00 |
| 1154 | Through and bond stone size 24 x 24 x39 cmThrough and bond stoneMaterial | 100 Nos | 0.07 | 5,000.00 | 350.00 |
| 0125 | Mason (for plain stone work) 2nd class)Mason (for plain stone work) 2nd classLabour | day | 1.76 | 816.00 | 1,436.16 |
| 0114 | BeldarLabour | day | 1.24 | 736.00 | 912.64 |
| 0115 | CoolieLabour | day | 0.71 | 736.00 | 522.56 |
| 0101 | BhistiLabour | day | 0.09 | 816.00 | 73.44 |
| 9999 | SundriesMaterial | L.S. | 13.52 | 2.27 | 30.69 |
- TOTAL
- 5,762.91
- Add 1 % Water charges on “W”
- 57.63
- TOTAL
- 5,820.54
- Add GST on “X” (multiplying factor 0.2127)
- 1,238.03
- TOTAL
- 7,058.57
- Add 15% CPOH on “Y”
- 1,058.79
- TOTAL
- 8,117.36
- Add Cess @ 1% on “Z”
- 81.17
- Cost of 1 cum.
- 8,198.53
- Say
- 8,198.55
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 348. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works