Skip to main content

CPWD Analysis of Rates · Stone Work

Extra for random rubble masonry with hard stone in

Square or rectangular pillars

Item number
7.4.1
Analysis basis
Details of cost for 1 cum
Priced inputs
2
Derived rate
956.00 / cum

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 7.4.1 Extra for random rubble masonry with hard stone in : Square or rectangular pillars — is derived from 2 priced inputs for 1 cum and works out to ₹956.00 per cum after water charges, GST, CPOH and cess. The full build-up is below.

CodeInputUnitQuantityRate (INR)Amount (INR)
0125Mason (for plain stone work) 2nd class)Mason (for plain stone work) 2nd classLabourday0.58816.00473.28
0115CoolieLabourday0.27736.00198.72
TOTAL
672.00
Add 1 % Water charges on “W”
6.72
TOTAL
678.72
Add GST on “X” (multiplying factor 0.2127)
144.36
TOTAL
823.08
Add 15% CPOH on “Y”
123.46
TOTAL
946.54
Add Cess @ 1% on “Z”
9.47
Cost of 1 cum.
956.01
Say
956.00

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 346. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works