Extra for providing grilled rolling shutters manufactured out of 8 mm dia M.S. bar instead of laths as per design approved by Engineer-incharge, (area of grill to be measured)

Item number
10.9
Analysis basis
a shutter
Priced inputs
1
Derived rate
₹768.25/ A SHUTTER
D-01/RATE ANALYSISITEM 10.9

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 10.9 (Extra for providing grilled rolling shutters manufactured out of 8 mm dia M.S. bar instead of laths as per design approved by Engineer-incharge, (area of grill to be measured)) is derived from 1 priced inputs for a shutter and works out to ₹768.25 per a shutter after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • and grill height 0.6m
  • Grill Area = 1.50sqm.
ANALYSIS OF RATES · ITEM 10.9DETAILS OF COST FOR A SHUTTER OF WIDTH 2.5M
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7068MATExtra for providing grilled rolling shutters with 8 mm dia M.S. rodsqm1.5540.00810.00
BUILD-UP TO RATE
TOTAL
810.00
Add 1 % Water charges on “W”
+8.10
TOTAL
818.10
Add GST on “X” (multiplying factor 0.2127)
+174.01
TOTAL
992.11
Add 15% CPOH on “Y”
+148.82
TOTAL
1,140.93
Add Cess @ 1% on “Z”
+11.41
Cost of 1.5sqm.
1,152.34
Cost per sqm.
768.23
SAY
₹768.25
D-02/SOURCEPRINTED PAGE 723
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
723

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 723. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSSTEEL WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.