CPWD Analysis of Rates · Steel Work

Providing & fixing fly proof wire gauze to windows, clerestory windows & doors with M.S. Flat 15x3 mm and nuts & bolts complete

Galvanised M.S. Wire gauze with 0.63 mm dia wire and 1.4 mm aperture on both sides

Item number
10.29.1
Analysis basis
Details of cost for 10 Nos. window shutter
Priced inputs
8
Derived rate
844.70 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 10.29.1 Providing & fixing fly proof wire gauze to windows, clerestory windows & doors with M.S. Flat 15x3 mm and nuts & bolts complete Galvanised M.S. Wire gauze with 0.63 mm dia wire and 1.4 mm aperture on both sides — is derived from 8 priced inputs for 10 Nos and works out to ₹844.70 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • 10x1.40x1.10=15.4 sqm
  • Wire gauze 10x1.40x1.10=15.4 sqm
  • Total=16.9 sqm
  • M.S. Flat 15x3=10x2x(1.40+1.10)=50 metre
  • Total=52.5 m
  • 52.5@0.35kg/m=18.4 kg
  • Add wastage @ 10 %=1.5 sqm
  • Add wastage @ 5%=2.5 m
CodeInputUnitQuantityRate (INR)Amount (INR)
7029Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia. of wire 0.63 mmGalvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mmMaterialsqm16.9260.004,394.00
9977CarriageMaterialL.S.18.22.2741.31
1008Flats upto 10 mm in thicknessFlats up to 10 mm in thicknessMaterialquintal0.1845,450.001,002.80
9977CarriageMaterialL.S.18.22.2741.31
0103Blacksmith 2nd classLabourday1.7816.001,387.20
0112Carpenter 2nd classLabourday1.7816.001,387.20
0114BeldarLabourday0.6736.00441.60
9999SundriesMaterialL.S.197.62.27448.55
TOTAL
9,143.97
Add 1 % Water charges on “W”
91.44
TOTAL
9,235.41
Add GST on “X” (multiplying factor 0.2127)
1,964.37
TOTAL
11,199.78
Add 15% CPOH on “Y”
1,679.97
TOTAL
12,879.75
Add Cess @ 1% on “Z”
128.80
Cost of 15.4 sqm.
13,008.55
Cost of 1 sqm.
844.71
Say
844.70

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 749. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works