Providing and fixing bolts including nuts and washers complete
- Item number
- 10.20
- Analysis basis
- 0.10q of
- Priced inputs
- 4
- Derived rate
- ₹159.35/ KG
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 10.20 (Providing and fixing bolts including nuts and washers complete) is derived from 4 priced inputs for 0.10q of and works out to ₹159.35 per kg after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 1034 | MAT | Bolts and nuts upto 300 mm in lengthBolts and nuts up to 300 mm in length | quintal | 0.1 | 5,200.00 | 520.00 |
| 0103 | LAB | Blacksmith 2nd class | day | 0.38 | 816.00 | 310.08 |
| 0114 | LAB | Beldar | day | 0.38 | 736.00 | 279.68 |
| 9999 | MAT | Sundries | L.S. | 4.55 | 2.27 | 10.33 |
- TOTAL
- 1,120.09
- Add 1 % Water charges on “W”
- +11.20
- TOTAL
- 1,131.29
- Add GST on “X” (multiplying factor 0.2127)
- +240.63
- TOTAL
- 1,371.92
- Add 15% CPOH on “Y”
- +205.79
- TOTAL
- 1,577.71
- Add Cess @ 1% on “Z”
- +15.78
- Cost of 0.10q
- 1,593.49
- Cost of 1 kg.
- 159.35
- SAY
- ₹159.35
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 740
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 740. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.