Skip to main content
R/DAR 2023

Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C

Fixing with carbon steel galvanised dash fastener of required dia and size (to be paid for separately)
Item number
10.11.2
Analysis basis
10 Nos
Priced inputs
12
Derived rate
₹128.25/ KG
D-01/RATE ANALYSISITEM 10.11.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 10.11.2 (Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C Fixing with carbon steel galvanised dash fastener of required dia and size (to be paid for separately)) is derived from 12 priced inputs for 10 Nos and works out to ₹128.25 per kg after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • of size 2.075x1.175m = 2.44 sqm. (weight
  • 30 kg).
  • Weight for 10 Nos. door = 10x30 = 300 kg
  • Labour for fabrication
  • Labour for fixing
  • Apply steel primer (2.44x1.00 for both
  • sides)= 10x2.44 sqm = 24.4 sqm
ANALYSIS OF RATES · ITEM 10.11.2DETAILS OF COST FOR 10 NOS. DOUBLE LEAF DOOR
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
1011MATSteel glazed door,window/ ventilator, all members like as F7D, F4B, K11 and K12B etcSteel glazed door, window/ ventilator, all members viz. F7D, F4B, K11 and K12B etc.kg30059.0017,700.00
9977MATCarriage of Steel DoorL.S.403.72.27916.40
0103LABBlacksmith 2nd classday1.7816.001,387.20
0116LABFitter (grade 1)day2.6897.002,332.20
0114LABBeldarday3.4736.002,502.40
9999MATSundriesL.S.153.72.27348.90
0114LABBeldarday0.27736.00198.72
0115LABCollieCoolieday0.195736.00143.52
0130LABMistryday0.084897.0075.35
0128LABMateday0.012816.009.79
9999MATHire charges of drill machine, scaffolding and sundriesL.S.122.22.27277.39
SUBRate as per item no 13.50.3 of SH : FinishingRate as per item 13.50.3sqm24.467.401,644.56
BUILD-UP TO RATE
TOTAL
27,536.43
Add 1 % Water charges on “W-A”
+258.92
TOTAL
27,795.35
Add GST on “X-A” (multiplying factor 0.2127)
+5,562.27
TOTAL
33,357.62
Add 15% CPOH on “Y-A”
+4,756.96
TOTAL
38,114.58
Add Cess @ 1% on “Z-A”
+364.70
Cost for 300 kg.
38,479.28
Cost of 1 kg.
128.26
SAY
₹128.25
D-02/SOURCEPRINTED PAGE 726
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
726

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 726. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSSTEEL WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.