Providing and fixing wash basin with C.I. brackets, 15 mm PTMT pillar cock, 32 mm PTMT waste coupling of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever required. White Vitreous China Flat back wash basin size 550x400 mm with single 15 mm PTMT pillar cock

Item number
17.7B
Analysis basis
Details of cost for 1 No.
Priced inputs
9
Derived rate
1,550.60 / No

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 17.7B Providing and fixing wash basin with C.I. brackets, 15 mm PTMT pillar cock, 32 mm PTMT waste coupling of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever required. White Vitreous China Flat back wash basin size 550x400 mm with single 15 mm PTMT pillar cock — is derived from 9 priced inputs for 1 No and works out to ₹1,550.60 per no after water charges, GST, CPOH and cess. The full build-up is below.

CodeInputUnitQuantityRate (INR)Amount (INR)
3229Vitreous china flat back wash basin 550x400 mmMaterialeach1554.00554.00
7406PTMT pillar cockMaterialeach1125.00125.00
7491PTMT - Waste Coupling 31/32 mmMaterialeach135.0035.00
1309C.I. bracket for wash basin and sinksMaterialpair195.0095.00
9999Red Lead, White Lead and GasketMaterialL.S.16.122.2736.59
9999Cement, sand and grit etcMaterialL.S.13.392.2730.40
9999Painting of brackets, fittings etc.MaterialL.S.26.912.2761.09
9977Carriage of materialsMaterialL.S.13.522.2730.69
9999Fixing ChargesMaterialL.S.53.822.27122.17
TOTAL
1,089.94
Add 1 % Water charges on “W”
10.90
TOTAL
1,100.84
Add GST on “X” (multiplying factor 0.2127)
234.15
TOTAL
1,334.99
Add 15% CPOH on “Y”
200.25
TOTAL
1,535.24
Add Cess @ 1% on “Z”
15.35
Cost of each
1,550.59
Say
1,550.60

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1300. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.