Providing and fixing soil, waste and vent pipes : 75 mm diameter
- Item number
- 17.35.2.2
- Analysis basis
- 16.92 m
- Priced inputs
- 6
- Derived rate
- ₹1,186.00/ M
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 17.35.2.2 (Providing and fixing soil, waste and vent pipes : 75 mm diameter : Centrifugally cast (spun) iron socketed pipe as per IS: 3989) is derived from 6 priced inputs for 16.92 m and works out to ₹1,186.00 per m after water charges, GST, CPOH and cess. The full build-up is below.
- (1.75mx10)-(9x0.065m) = 16.915 m. say
- 16.92 m
- including 5% allowance for wastage
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 3621 | MAT | C.C.I.(spun) socketed soil, waste and vent pipe 1.80 metres long:75mm diaC.C.I. (spun) socketed soil, waste and vent pipe 1.80 metres long:75 mm dia | each | 10.5 | 1,225.00 | 12,862.50 |
| 9999 | MAT | Scaffolding | L.S. | 80.73 | 2.27 | 183.26 |
| 9977 | MAT | Carriage of materials | L.S. | 40.38 | 2.27 | 91.66 |
| 0116 | LAB | Fitter (grade 1) | day | 0.35 | 897.00 | 313.95 |
| 0100 | LAB | Bandhani | day | 0.17 | 816.00 | 138.72 |
| 0114 | LAB | Beldar | day | 0.7 | 736.00 | 515.20 |
- TOTAL
- 14,105.29
- Add 1 % Water charges on “W”
- +141.05
- TOTAL
- 14,246.34
- Add GST on “X” (multiplying factor 0.2127)
- +3,030.20
- TOTAL
- 17,276.54
- Add 15% CPOH on “Y”
- +2,591.48
- TOTAL
- 19,868.02
- Add Cess @ 1% on “Z”
- +198.68
- Cost for 16.92 m pipe
- 20,066.70
- Cost per metre
- 1,185.98
- SAY
- ₹1,186.00
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1331
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1331. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.